Rohtang Pass, now known as Atal Tunnel, is a very well-known and popular mountain move, nearly thirteen,058 ft, positioned on the jap Pir Panjal Variety of the Himalayas close to 51 km from Manali. Especially identified for its mesmerizing landscape, the pass connects the Kullu Valley with the Lahaul and Spiti Valleys of Himachal Pradesh, India.

Known for its scenic beauty, Rohtang Move holds strategic value for India. Every year, throughout July to September, the road gets to be a passage to the men and women of Lahul valley transporting their funds crop, potatoes and peas to the marketplaces across Atal Tunnel to Kullu and earning income for the unstable temperature interval of nine months.


The design of the tunnel was very much awaited and was finally inaugurated on Oct third 2020 by India´s Key Minister Narendra Modi.

Now that we have released the Rohtang Atal Tunnel, let’s see Encardio-rite’s task overview, the instrument used, and the providers presented.

Task Overview:

Identified as one of the highest trafficable passes in the world, the Rohtang go is designed to produce an all-climate route to Leh and Lahaul and Spiti valleys in Himachal Pradesh. The Rohtang Move Highway Tunnel is positioned in the Western Himalaya location of Northern India with its altitude of 3,980 m. With a duration of 9.02km, it is also the longest tunnel in the world at an altitude of more than three,000 metres or 10,000 feet earlier mentioned mean sea stage.

For about four months, the go is covered with white sheets of heaviest snowfall and blizzards, producing the route inaccessible for any person.
Renamed soon after the previous Key Minister of India, Mr. Atal Bihari Vajpayee, the tunnel minimizes the vacation length from 4 to 6 hours to only thirty minutes. It also minimizes the distance amongst Manali and Keylong by about 46 km (28.six mi).

The Rohtang Atal Highway Tunnel with its 8.8km of size is the longest street tunnel in India located at a higher altitude. Apart from substantial altitude and uncooperative weather, the geological issue in the Himalaya was a huge obstacle faced by the Encardio Staff. Braving the freezing temperature, snowfall, repeated floods and thin air, the team soldiered ahead, offering with the most exact sensors and instrumentations.

The rocks found inside of the tunnel area are primarily schist and migmatite with predicted disturbed zones and in some specific places, substantial squeezing rock was also located.

Rohtang Pass Tunnel Particulars:

Condition (cross-part) of the tunnel: Horseshoe

Concluded width: ten.00 m (32.eight ft) at road stage.

Design approach: Drill & Blast with NATM.

Overburden: Maximum 1,900 m, regular much more than 600 m.

Unexpected emergency tunnel: A 2.twenty five m high and 3.6 m vast unexpected emergency tunnel is integrated into the tunnel cross-area beneath the main carriageway. There are 18 egress tunnels, with an opening soon after each and every five hundred metres in situation of any hazard or crisis.

Other security measures include telephone connections at each one hundred fifty metres for crisis interaction, fireplace hydrant mechanisms at every single 60 metres, auto incident detection system with CCTV cameras at every 250 metres, air high quality monitoring at each and every 1 Km, evacuation lights/exit signs and broadcasting system throughout the tunnel among other individuals.